The Light at the End

Redoing the entry ceiling...

In the past few days, I’ve stripped, re-textured, and painted three ceilings, installed the last three light fixtures and the last two fans. I’m just about ready to start wall painting inside, and the forecast says I’ll be able to paint outside, too. I’ve primed and painted the kitchen back splash tiles, and the last drawers in the Master Bathroom. With recent hail, I’m also filing an insurance claim on my roof to see if I might get a new one on the house before Flipside. The end of the project seems closer than it ever has before. I’m a little angry that all of the fans and light fixtures somehow got removed from my checklist before I did them, but that’s just accounting. All the ceilings in the house are done.

47 Items left on my Top Priority List. 20 Days until Flipside.

Advertisements
This entry was posted in Uncategorized and tagged , , , , , , , , , , , , . Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s